
Critical Path
Running 34m, Critical Path (2026) is a film in the 123movies catalog. The cast includes Justin Styer and Elon Musk. 1 vote put it at 10/10. Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.













